| Drinking
Water Supply |
|
|
| Drinking
Water. Behind these two words lies an
absolute priority for every country
in the world. Appraising the state of
resources, planning for all types of
situation, designing and sizing drinking
water supply facilities, supervising
the construction of infrastructure,
managing and maintaining them. For BCEOM
drinking water is a vital commodity.
|
 |
|
 |
Our
expertise
 |
Inventory
and appraisal of the existing
situation, |
 |
Demographic
analysis and evaluation
of requirements, |
 |
Study
and design of works to allow
mobilisation of water resources, |
 |
Study
and design of treatment,
pumping and storage works, |
 |
Designing
and modelling distribution
networks, |
 |
Study
of regulation using remote
control and remote management, |
 |
Study
of financial feasibility
and pricing rates, |
 |
Reform
of the institutional framework
and implementation of new
management methods, |
 |
Performance
of rehabilitation and extension
works, |
 |
Organisation and assistance
with management and operation,
|
|
|
| |
|
 |
Our
experience
| |
|
BANGLADESH
- 4th Water Supply Project
for Dhaka (1991-2002)
Long-term investment plan and
feasibility study, strengthening
the capacity for drinking
water production and
distribution in Dhaka,
impact study for the
Saidabad water treatment
plant, checking the
design for the Saidabad
water treatment plant
and supervising the
construction works.
Supervision of works
for lots 1, 3, 5 and
6 and preliminary design
for Lot 7 of the project
for the Saidabad water
treatment plant.
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
GUINEA
- Project for Strengthening
the Drinking Water Supply
System for Kindia (2000-2002)
Conducting detailed studies
and producing preliminary
designs for the construction
of a drinking water
supply system for the
town of Kindia; preparing
tender documents; technical
assistance to SONEG
for bid analysis and
construction supervision;
organising an information
campaign to increase
the awareness of the
beneficiary populations.
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
HONDURAS
- Master Plan for a
Drinking Water Supply
for Tegucigalpa to 2015
(2000)
Study of new resources, assessing
their potential, determining
structures and the most
appropriate planning
sequence, drafting feasibility
studies; organising
service and operation
zones for primary systems;
studying suitable reforms
to strengthen the water
company and create the
requisite conditions
for efficient governance
as part of the new guidelines
for the Water Law (private
sector participation,
privatisation).
|
|
|
| |
|
|
|
|
| |
|
PHILIPPINES
- Provincial Cities
Water Supply Prioject
- PCWSP - Phase 5 (1997-2002)
Programme
of final designs and
supervision of extension,
construction or rehabilitation
works to the drinking
water supply network
for 11 secondary towns,
including finding and
developing new resources,
improving or building
treatment plants, building
a specialised training
centre and supplying
its equipment, implementing
specific computerised
management systems within
the governmental body
(Local Water Utilities
Administration - LWUA)
and within the 11 water
selling districts (administrative
management, general
accounting, project
and loan monitoring,
invoicing and debt recovery),
practical training in
the management of networks
and in the use of the
specifically-developed
management programmes.
|
|
|
| |
|
|
|
|
| |
|
RUSSIA
- Institutional and
Technical Appraisal
of 6 municipalities
for private sector participation
in the field of water
(2000)
Determining an institutional,
legislative and commercial
framework conducive
to the development of
private initiatives
in the water sector.
Appraisal of 6 water
utilities in the Federation:
for each of these towns,
study of the technical
water supply and sanitation
systems, social-economic
conditions, subscribers,
work organisation and
operating services,
legal context, etc.;
determining the practical
ways of cooperating
between the water utilities
and private firms willing
to participate; proposing
a government bill to
encourage concession
systems.
|
|
|
| |
|
|
|
|
| |
|
RUSSIA
- Feasibility Study
of Drinking Water Supply
and Waste Water Treatment
Installations and Preparing
an Immediate Investment
Programme for Three
Towns (1998-1999)
Appraisal of water supply installations,
sanitation systems and
waste water treatment
plants in Tver (500,000
inhabitants), Volkhov
(50,000 inhabitants)
and Vologda (300,000
inhabitants) with a
view to rehabilitating
them and improving their
efficiency.
|
|
|
| |
|
|
|
|
| |
|
CHAD
- 8th
EDF Village Hydraulics
Programme (1999-2003)
Technical assistance for providing
support to the Hydraulics
Department, increasing
the number of water
supply points available
(1000 new boreholes,
200 rehabilitated boreholes,
30 pumping stations
with drinking water
supply), appropriation
and management of water
points by the beneficiaries
and setting up a maintenance
system.
|
|
|
| |
|
|
|
|
| |
|
TOGO
- Village Hydraulics
Programme for the member
countries of the "Conseil
de l'Entente";
Technical Assistance
and Management in Togo
(1996-2000)
Design,
construction supervision
and management of a
village hydraulics programme
in a maritime region,
involving 400 new boreholes,
rehabilitating 400 boreholes,
installing 800 manual
pumps and designing
and supervising the
works for 10 mini drinking
water supply systems.
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
|
|